1000万吨海水选矿、尾矿山谷充填项目,首钢秘鲁铜铁矿<br>10.0mta seawater mineral processing, tailings valley filling project, SISC Peru copper and iron mine.
1000万吨海水选矿、尾矿山谷充填项目,首钢秘鲁铜铁矿
10.0mta seawater mineral processing, tailings valley filling project, SISC Peru copper and iron mine.
矿物:磁矿尾矿+氧化矿尾矿

2台43米铜铁矿尾矿半深锥高压缩浓密机HCT43,单台处理能力(干)417-670t/h 2台5.0m3加药机FPF5.0
底流65±2% w/w,溢流<100ppm粒度分布80% -0.074mm

投产2018.09 put into production
Minerals: magnetic tailings + oxidized ore tailings.

Two 43m tailings semi-deep cone high compression thickener HCT43, unit capacity (dry) 417-670t/h
Two 5.0m3 dosing machines FPF5.0
U/F >65±2% w/w, O/F <100ppm, particle size distribution 80% -0.074mm